<th id="izpf2"></th><input id="izpf2"><output id="izpf2"><strike id="izpf2"></strike></output></input>
    <input id="izpf2"></input>
  • 湖南快乐十分湖南快乐十分官网湖南快乐十分网址湖南快乐十分注册湖南快乐十分app湖南快乐十分平台湖南快乐十分邀请码湖南快乐十分网登录湖南快乐十分开户湖南快乐十分手机版湖南快乐十分app下载湖南快乐十分ios湖南快乐十分可靠吗

     

    Temporary Road Closure at Nursery Path near William M.W. Mong Engineering Building

    Extension on 2/F of Ho Sin-Hang Engineering Building for New Laboratory Space

    Ground Investigation Works for 300-Place Student Hostel at Shaw Campus

    Renovation at 5/F of Mong Man Wai Building

    Topographic, Tree and Utility Surveys for 300-Place Student Hostel at Shaw Campus

    Renovation of Laboratory to Room 202 & 202A at Hong Kong Institute of Biotechnology

    Site Formation Work for Centralized General Research Lab Complex (Block 2) at Area 39

    Temporary Road Closure at Nursery Path near William M.W. Mong Engineering Building

    Temporary Closure of Road and Car Parking Spaces for Hoisting Air-Conditioning Equipment / Materials at Mong Man Wai Building

    Renovation Work of Inno Hub on LG/F to R/G of Inter-University Hall

    Extension for New Laboratory Space on Roof of Mong Man Wai Building

    Extension for New Laboratory Space on 1/F of William M.W. Mong Engineering Building

    Topographic Survey, Tree Survey and Underground Utilities Detection / Survey for New Dangerous Goods Store for Compressed Gases at CUHK

    Slope Stability Improvement Works at the South of University Residence No. 17 (Feature No. 7NE-C/C65)

    Temporary Closure of Road and Car Parking Spaces for Hoisting Air-Conditioning Equipment and Materials at Mong Man Wai Building

    Ground Investigation Work for 250 Place Student Hostel at United Campus

    Temporary Traffic Arrangement for Hoarding Works at New Asia Road and New Asia Circle

    Temporary Traffic Arrangement for Hoarding Works at Central Avenue

    Upgrading and Improvement of Air-Conditioning Plant at Mong Man Wai Building

    Survey for the Proposed Redevelopment of Art Museum Annex

    Extension to University Sports Centre and associated external works

    Temporary Traffic Arrangement for Hoarding Works at Central Avenue

    The Construction of Green Roof and Associated Work at 3/F & 4/F Roofs of Choh-Ming Li Basic Medical Sciences Building

    Renovation Works of MakerSpace Phase II and associated Enhancement Works in Learning Garden at LG/F of University Library

    Ground Investigation Works for Centralized General Research Lab Complex (Block 2) at Area 39

    Renovation Works of Laboratory at Room 258 University Science Centre

    Temporary Closure of Part of Traffic Road and Pedestrian Pavement at New Asia Circle

    Renovation Works for Language Laboratories at Room 401, 410 & 416 of Lee Shau Kee Building

    Renovation Works at 2/F of Elisabeth Luce Moore Library

    Renovation Works at Room G01D of Li Dak Sum Yip Yio Chin Building

    Construction Works for Student Hostel at New Asia College

    Upgrading Works at Central Data Centre 2 at 7/F Wu Ho Man Yuen Building

    Renovation Works of Chan Kwan Tung Inter-University Hall

    Renovation Works at 9/F to 11/F of William M. W. Mong Engineering Building

    Construction Works for Chung Chi Student Development Complex

    Renovation Works at 2/F of Run Run Shaw Science Building

    Renovation Works at 1LG/F of Choh-Ming Li Basic Medical Sciences Building

    Renovation Works at LG1 to LG4 Lee Woo Sing College

    Renovation Works of Microfilm Room at G/F of Library Extension Building

    Renovation Works of Makerspace in Learning Garden and Associated Enhancement Works at LG/F of University Library

    Renovation Works of Laboratory at Room LG90 University Science Centre

    Renovation Works of Laboratory at Room LG31 University Science Centre

    Renovation Works of SCS Railway Plaza Tsim Sha Tsui

    Renovation Works of William M.W. Mong Engineering Building

    Renovation Works of Ho Sin-Hang Engineering Building

    Temporary Closure of Road and Car Parking Spaces for Hoisting Equipment and Materials to the Roof of Shanghai Fraternity Association Research Services Centre

    Supply and Installation of Campus Model at University Entrance of The Chinese University of Hong Kong

    Temporary Closure of Road and Car Parking Spaces for Up-Grading of A/C Works at Roof of Shanghai Fraternity Association Research Services Centre

    Ground Investigation Works at University Sports Centre

    Renovation Works of 1/F Lobby, Li Wai Chun Building

    Renovation Works of I-House Block 1 & 2

    Temporary Closure of Car Park at Campus Circuit North next to C. W. Chu College

    Renovation Works at Room 1206a of 12/F Yasumoto International Academic Park

    Foyer Enhancement Works for Choh-Ming Li Basic Medical Sciences Building

    Renovation of Laboratory to Room 216, 216A, 220 & 220A at Hong Kong Institute of Biotechnology

    Temporary Closure of Road at Campus Circuit North and Area 39 Drive near C. W. Chu College

    Renovation of United College Wu Chung Multimedia Library

    Feature Wall at G/F Lobby of Run Run Shaw Science Building

    Temporary Closure of Road near C. W. Chu College (Area 39 Drive)

    Temporary Closure of Road near C. W. Chu College (Area 39 Drive)

    Hoarding and Demolition Works for Chung Chi Student Development Complex

    Renovation of Laboratory to Room LG121 at Run Run Shaw Science Building

    Renovation Works at 3/F John Fulton Centre

    Renovation of Laboratory to Room 238, 238A & 240 at Hong Kong Institute of Biotechnology

    Renovation of Laboratory to Room 230 & 230A at Hong Kong Institute of Biotechnology

    Renovation Works for Laboratory in Room 138 at Lady Shaw Building

    Renovation Works at Room G01 of John Fulton Centre

    Temporary Closure of Road at Campus Circuit North (Leading to Lo Kwee-Seong Integrated Biomedical Sciences Building)

    Renovation Works at 5/F Room 538 & 539 of Sino Building

    Renovation Works of G/F, 1/F, 3/F & 4/F at Shanghai Fraternity Association Research Services Centre

    Upgrading and Improvement of Air-Conditioning Plant at University Science Centre

    Ground Investigation Works at Staff Quarters Block D and G of Chung Chi College

    Renovation Works at 6/F of Tin Ka Ping Building

    Renovation Works of Lady Shaw Buildlng

    Renovation Works of Pi Ch'iu Buildlng

    Temporary Closure of Car Parking Spaces for Hoisting Work to Roof of Academic Building No.1

    Improvement Works of Disabled Ramp at Swire Hall 1 & 2 of Fung King Hey Building

    Temporary Closure of Existing Car Park Area near C. W. Chu College (Campus Circuit North)

    Emergency Preventive Works at the South of University Residence No. 17 (Feature No. 7NE-C/C65)

    Temporary Closure of Existing Pedestrian Pavement at Campus Circuit North (Near C. W. Chu College)

    Temporary Closure of Existing Cyclist Track at Area 39 (Near New Student Hostel Site)

    Renovation Works of G/F and 5/F of Hang Seng Hall at United College

    Section 3 Underground Drainage Works at 2x338-Place at Student Hostels on Northern Campus (Block A3 & A4)

    Temporary Closure of Pedestrian Pavement at Area 39 Drive (leading to Lo Kwee-Seong Integrated Biomedical Sciences Building)

    A & A Works for Li Wai Chun Building from LG1/F to 1/F

    Temporary Closure of Part of Traffic Road and Pedestrian Pavement at Central Avenue

    Notice of Commencement of Construction Works at 2x338-Place at Student Hostels on Northern Campus (Block A3 & A4)

    Notice of Site Possession and Carpark Closure for CUHK Medical Centre

    Renovation and Alteration Works for Siu-Loong Pao Building

    A Revolutionary Study Commons - University Library Extension (Video)

    Site Formation and Foundation Works at Student Hostels on Northern Campus (Block A3 & A4)

     

     

     

    Privacy Policy | Disclaimer
    Copyright 2020 Campus Development Office, The Chinese University of Hong Kong

     

    湖南快乐十分{{转码主词}官网{{转码主词}网址